What the load bank test report does
A load bank test puts a generator under a known electrical load and proves it can carry that load for a set time. Most crews still write the readings on a paper sheet and work out the percentages later. This tool does that part for you while you type.
For each reading you enter the minutes into the test and the kW the load bank shows. If the load bank does not show kW, enter the line-to-line volts and the phase amps instead, and the tool computes kW from them. It then shows each reading as a % of the generator's nameplate kW and adds up how long the generator held each step of the plan.
When the run meets every step, the result reads Pass. When it does not, it reads Fail and the step table shows which step fell short and by how many minutes.