Generator load bank test report

Enter the generator's nameplate kW and your timed readings. The tool works out kW and the % of rated load for each reading, checks the run against the NFPA 110 test plan you pick, and prints a clean report for your customer.

Gratuito. Sem necessidade de registo. Nada sai do seu navegador.

Test details

Phases

Resultado

Aprovado

  • 50%: 30 / 30 min, met
  • 75%: 60 / 60 min, met

Leituras

Time (min)Load (kW)Volts A-BVolts B-CVolts C-AAmps AAmps BAmps CFrequency (Hz)Oil pressure (psi)Coolant temp (°F)Exhaust temp (°F)Rated loadRemove reading
50%
50%
75%
75%
75%
75%
75%

Pré-visualização

Generator Load Bank Test Report

Test details

Test date
24/11/2026
Nameplate kW
500
Phases
3
Power factor
1
Test plan (NFPA 110)
Annual load bank test

Leituras

Time (min)Load (kW)Rated load (%)Volts A-BVolts B-CVolts C-AAmps AAmps BAmps CFrequency (Hz)Oil pressure (psi)Coolant temp (°F)Exhaust temp (°F)
0250504804814793013013016055185620
15250504804814793013013016055185640
30375754804814794524524526055185760
45375754804814794524524526055185780
60375754804814794524524526055185785
75375754804814794524524526055185790
90375754804814794524524526055185790

Load Bank Result

PassoRequired (min)Held (min)Resultado
50% of rated kW3030Met
75% of rated kW6060Met
Test result: Annual load bank test (NFPA 110)Aprovado

Keep every load bank test with the generator

The free ToolBerry app has the same load bank table on the generator for each visit. It works out the result as you type and puts it on the service report, offline, on iPhone, Android and the web.

Não é necessária conta nem cartão de crédito. Funciona offline.

What the load bank test report does

A load bank test puts a generator under a known electrical load and proves it can carry that load for a set time. Most crews still write the readings on a paper sheet and work out the percentages later. This tool does that part for you while you type.

For each reading you enter the minutes into the test and the kW the load bank shows. If the load bank does not show kW, enter the line-to-line volts and the phase amps instead, and the tool computes kW from them. It then shows each reading as a % of the generator's nameplate kW and adds up how long the generator held each step of the plan.

When the run meets every step, the result reads Pass. When it does not, it reads Fail and the step table shows which step fell short and by how many minutes.

Como utilizar, passo a passo

  • Enter your company, the site, the generator and the technician.
  • Enter the nameplate kW from the generator's data plate.
  • Pick the test plan: the annual load bank test, the older 25, 50 and 75% annual plan, the monthly exercise or the 36-month test.
  • Add one row per reading. A reading every 15 minutes is common. Start the first row at 0 minutes.
  • Type the kW from the load bank, or the volts and amps if it shows no kW.
  • Check the result and the step table, then print the report or save it as a PDF.

How the result is worked out

The % of rated load is the reading's kW divided by the nameplate kW. When kW comes from volts and amps, the tool uses the square root of 3 times the average line-to-line volts, times the average amps, times the power factor, divided by 1,000. For a single phase generator it leaves out the square root of 3. A resistive load bank runs at a power factor of 1.0, which is the default.

Time counts toward a step only between two readings that are both at or above the step's load. That is a strict reading on purpose: the load is proven at both ends of every span. Extra time on one step does not count toward the next, and a drop below the previous step breaks the run, so the count starts again.

The test plans follow NFPA 110. The annual load bank test runs at 50% of nameplate kW for 30 minutes, then 75% for 60 minutes. The 1999 and 2005 editions used 25% for 30 minutes, 50% for 30 minutes and 75% for 60 minutes. The monthly exercise is 30 minutes at 30% or more. NFPA 110 also accepts the engine maker's minimum exhaust temperature instead of the 30% load, and this tool checks the 30% load route only. The 36-month test for Level 1 systems runs for the duration of the system's class at 30% or more, and may stop after 4 continuous hours when the class is longer. The tool uses 4 hours, so a system with a shorter class needs only its class duration. Check which edition your authority having jurisdiction enforces.

What a good load bank report includes

Customers and inspectors want to see the generator, its rating, the plan you tested to, every reading and the result. Engine readings matter too: oil pressure, coolant temperature and exhaust temperature show the engine stayed healthy under load, and frequency shows the governor held speed.

Keep the report with the generator's service history. A run that passes this year but shows rising exhaust temperatures is worth a note for the next visit.

Perguntas frequentes

Does this replace the NFPA 110 standard?
No. The tool applies the load and time steps of the test plans and cites NFPA 110 by number. Read the standard and your local code for everything else a test must cover.
My load bank shows kW. Do I need volts and amps?
No. A typed kW always wins. Volts and amps are only used to work out kW for a row that has none, and they print on the report either way.
Is my data sent anywhere?
No. Everything runs in your browser, and nothing you type leaves your device.
Can I keep these tests with the generator?
Yes, in the ToolBerry app. It has the same load bank table on the generator for each visit, works out the same result, and puts it on the service report.